Restauration 2014f
A fresh start for the restauration of the synagogue was made.
Connections
We have achieved the connection to the drainage system: rain water doesn't any longer threaten the foundations of the building.
The connection to electric mains and water was prepared.
Floor
The old floor has been removed. A new concrete floor which at the same time is protecting the static of the building has been built.
The electrectic installation is integrated into the construction. So we need not touch the wall plastering with its panting.
Pictures
Pictures showing the ongoing restauration of the synagogue.